© Copyright 2018 Epik Solutions

Healthcare Infrastructure - Sustainable development in Healthcare Construction

Healthcare construction needs robust infrastructure good enough to accommodate heavy machinery and the required number of beds along with other core facilities. Alexandra being both pre-construction company and the post-construction company is one of the pioneers in Construction Company Massachusetts branding.

healthcare_construction

We operate on 4 core concepts.
• Conceptual Planning
• Feasibility Study
• Schematic Design
• Collaboration

Conceptual planning helps us in Preconstruction company phase. This is the time when we do a lot of hypotheses and comes to conclusion with a best possible plan. Feasibility Study is equally important to analyze how much space we may require and what can be the construction challenge to manage.
Than comes Schematic design which is equally important as it provides a complete structure of action plan for execution. Last but not the least is Collaboration among different plan of Flooring & design to get the desired outcome. All the above principles apply to Alexandra in all the phases. This being Pre-construction company & Post-Construction Company has set good standards as construction company Massachusetts Icon.

 

Pre-Requisite of Healthcare Construction

Healthcare Construction has come a long way from sustainable development to usage of cutting edge technology to provide dynamic Infrastructure. In adherence to Leed certification, we have constructed healthcare facility to support accommodation of all categories of room. This can facilitate multiple patients and can ensure the speedy recovery. Not only this we also lay focus on multi-level parking to ensure time-saving because of unnecessary waiting time at the time of admission.

Our Main focus of Core Healthcare Construction is to have world-class facility management and following amenities.

  • Adequate Floor planning to accommodate  Operation Théâtre along with other basic amenities.
  • Conducive to facilitate uber food services to ensure a healthy diet.
  • Multilevel parking Facilities
  • Required numbers of rooms to accommodate numerous patients.

As preconstruction Company, we ensure that detailed blueprint is prepared before execution.

Being post construction company our action plan focuses on delivering the best as per construction company Massachusetts standards.

Contact us

 

TOP test